Section 2 A 9. Fire Line Connection
SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS A. Rights-of-Way Permits and Procedures 9. Fire Line Connection Permit requirements for Fire Line Connection: a) 4 copies of the construction drawing plan/profile signed and sealed by the engineer of record, identifying all existing underground facilities. b) The applicant must submit a signed and notarized Fire Line Service Agreement form to Engineering Permitting along with the appropriate fees payable to the City of Miami Beach for the selected size fire suppression service. c) Provide copy of City of Miami Beach Fire Department Fire Flow Calculations. |