Section 2 A 8. Fire Hydrant

Fire Hydrant

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

8. Fire Hydrant

Permit requirements for Fire Hydrant Installation/Relocation:

a) 4 copies of the construction drawing to include right of way dimensions identifying property lines signed and sealed by the engineer of record.

b) The applicant must install City approved โ€œAmerican Darlingโ€ type fire hydrant assembly model number B84B-5, with 5-1/4โ€ณ threads.