Section 2 A 14. Roofing Equipment

Roofing Equipment

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

14. Roofing Equipment

Permit requirements for Roofing Equipment:

a)  Four (4) sets of site plan drawn to scale,  (11″x17″ minimum size), to include Right-of-Way dimensions identifying property lines

b) Provide current copy of Certificate of Insurance Liability//Workmen’s Compensation coverage naming the City of Miami Beach as additionally insured, to be approved by the City’s Risk Management Division

c) $500.00 Minimum sidewalk bond or security deposit required when crossing sidewalk with heavy machines/equipment

d) Photographs of existing sidewalk/curb/gutter/asphalt pre-existing conditions

e) Proof (receipt) of parking meter space purchased from City of Miami Beach Parking

Enforcement Division

f) Maintenance of Traffic Plan (MOT). An off duty Miami Beach Police officer or F.D.O.T. Certified Flagman may be required. A determination will be made by Public Works Engineering.