Section 2 A 12. Manhole Maintenance
SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS A. Rights-of-Way Permits and Procedures 12. Manhole Maintenance Permit requirements permit for Manhole Maintenance: a) Four (4) sets of site plan drawn to scale, (11″X17″ minimum size), to include Right-of-Way dimensions identifying property lines b) Provide certified maintenance of traffic plan. c) Provide copy of Florida Department of Transportation (F.D.O.T. approved permit package to include roadway/lanes closure approval for non-emergency manhole maintenance work. FDOT – District 6 Permit Office, 1000 NW 111 Ave., Miami, FL 33172 (305-470-5367) d) Provide copy of Dewatering permit and DERM permit. e) Maintenance of Traffic (M.O.T.). An off-duty Miami Beach Police officer or F.D.O. T. Certified Flagman may be required. A determination will be made by the Public Works Engineering. |