Central Bayshore South
- Portion of Neighborhood No. 8 Central Bayshore “A” bounded on the north by the south right-of-way line of 34 Street; on the east by the west right-of way line of Pine Tree Drive; on the south by Dade Boulevard; and on the west by the Miami Beach Golf course. The project area includes that portion of Prairie Avenue between Dade Boulevard and 34 Street, North Meridian Avenue from Dade Boulevard and 28 Street, and Sheridan Avenue from Pine Tree Drive to 28 Street.
Project Status: |
Scope of Work
Construction of the portion extracted from the Neighborhood No. 8 Central Bayshore A. The work will include, but not be limited to, site preparation/ earthwork, roadway reconstruction, curbing, water main installation, and water service relocation; installation of a stormwater pump station, and storm drainage infrastructures
Project Timeline
Start Date: June 2016
Completion Date: TBD
Project Team
City of Miami Beach Senior Capital Project Coordinator
Sabrina Baglieri
Public Information –
Vanessa Vazquez, Neighborhood Affairs Coordinator
Ph: 305.673.7575
Email: VanessaVazquez@miamibeachfl.gov