The scope of Work for the above-referenced Fire Flow Projects is as recommended in the City’s Water System Master Plan dated October 2019 for fire flow improvements within the Flamingo and City Center Neighborhoods. The work includes upsizing approximately 6,020 LF of existing water mains to of 6”, 8”, 12”, and 16” diameter zinc-coated and poly-wrapped ductile iron pipe to meet fire flow pressures
Date: Tuesday, October 1, 2024
Time: 9:00am ET
Location: Northeast corner of 14th Street and Meridian Avenue
Miami Beach, FL 33139