Section 2 A 3. Bus Shelters

Bus Shelters

SECTION 2 RIGHTS-OF-WAY CONSTRUCTION REQUIREMENTS

A. Rights-of-Way Permits and Procedures

3. Bus Shelters

Permit requirements for bus shelters:

a) Provide four (4) sets of the Engineer of Record signed/sealed drawings to include Plans/Profile sections and details, drawn to scale, (11″X17″ minimum size) showing existing condition & proposed construction with elevations.

b) Proof of Contractor’s licensed with the State of Florida and Miami Dade County

c) Provide certified Maintenance of Traffic Plan (MOT).

d) Provide copy of notification letter to property owners in construction area (s).

e) Provide photographs of existing sidewalk/curb/gutter/asphalt pre-existing conditions.