The scope of Work for the above-referenced Fire Flow Projects is as recommended in the City’s Water System Master Plan dated October 2019 for fire flow improvements within the Flamingo and City Center Neighborhoods. The work includes upsizing approximately 6,140 LF of existing water mains to of 6”, 8”, 12”, and 16” diameter zinc-coated and poly-wrapped ductile iron pipe to meet fire flow pressures.
Join on your computer, mobile app or room device
Click here to join the meeting
Meeting ID: 269 481 071 206
Passcode: QJNwc2
Download Teams | Join on the web
Or call in (audio only)
Phone Number: +1 786-636-1480 United States, Miami
Phone Conference ID: 828 335 006, then #
Reference: Section 0100, Sub-section 6, Pre-Bid Interpretations.