• City of Miami Beach on Issuu
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
Phone: 305.673.7000

City-Owned Cultural Facilties

Fillmore Miami Beach

Organizational Background

The City of Miami Beach has a management arrangement with Live Nation to operate and maintain the Fillmore Miami Beach at Jackie Gleason Theater located at 1700 Washington Avenue. Live Nation has agreed to work with the City regarding these significant necessary enhancements.

Estimated Project Timeline

Approximately 24 months

Project Amount

$29,100,000

List of Capital Improvements

  • Auditorium furniture and finishes replacement
  • First Floor Lighting and Finish Upgrades (FOH)
  • Second Floor Lighting and Finish Upgrades (FOH)
  • Third Floor Lighting and Finish Upgrades (FOH)
  • Fourth Floor Exit Corridor- Painting and Carpet Replacement (FOH)
  • Repairs to Existing Catwalk Structural Panels at Stage Roof Penthouse+ Lapeyre Stair
  • Structural Panels at Stage Roof Penthouse+ Lapeyre Stair
  • Exterior Window and Door Replacement
  • Exterior Structural Repairs
  • Driveway Redesign and enhanced pedestrian area
  • Basement Lighting and Finish Upgrades
  • First Floor Lighting and Finish Upgrades (BOH)
  • Second Floor Lighting and Finish Upgrades (BOH)
  • New Second Floor VIP Area
  • New Commercial Kitchen
  • Acoustical Improvements at Dressing Rooms/ Corridors
  • Asbestos, Lead Paint, IAQ Abatement Allowance
  • Freight Elevator renewal
  • Exhaust System renewal
  • Chilled Water Piping renewal
  • HVAC Replacements
  • Electrical Enhancements (including FA allowance)
  • Plumbing Enhancements (facility-wide)
  • Upgrades to Existing Fire Protection System
  • Emergency Lighting renewal
  • Theatrical Systems Upgrade
  • New LED Marquee Sign